MRT: Problems All Around

So far the Metro Rail Transit has 3 or more incidents in the span of 2 months, although only one resulting in injuries.

This goes to say that things should be changed. Here are a few things we think should be changed in the Metro Rail Transit operations.

  1. Train upgrades – This is the first and foremost thing to do. Defective trains, old trains and misused trains. Whatever the problem is should be addressed quickly. This is to prevent any more mishaps in the future.
  2. Maintenance – Cause and effect is a universal law. If the trains are maintained it tends to work well.
  3. Alleviate traffic problems in the Metro – A central problem of the Metro Rail Transit is the carrying of passengers more than the allowed capacity of the trains. If the traffic problem is resolved, passengers will be more than willing to take alternative transportation.